Because of flow shop scheduling is one of the most important problems in the area of production management, In this paper, what I have did is that, I have developed a new algorithm for n-jobs m-machine flow shop scheduling problem for special case of n-jobs m-machine flow shop scheduling problem. And also, there is a good self explanatory example to explain the algorithm very well.
Published in | Applied and Computational Mathematics (Volume 5, Issue 1) |
DOI | 10.11648/j.acm.20160501.11 |
Page(s) | 1-9 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2016. Published by Science Publishing Group |
N-jobs M-machine, Flow Shop Scheduling Problems
[1] | Chenge, T. C. E., “Optimal due date determination and scheduling of n- jobs on a single machine”, Journal of the Operation Research society 35, pp. 433-437, 1984. |
[2] | Ikram, M., “A note on minimization of lateness Cost Function and Determination of Optimal Due – date in two machine problem,” Pure Applied Mathematika sciences, Vol. XXIII, 1-2, March 1986. |
[3] | Johnson, S. M. “Optimal two and three stage production schedules with setup times included.” Naval Research Logistics Quarterly, Vol I, 61-68, 1954. |
[4] | Jackson, J. R., “An extension of Johnson’s results on lot scheduling”, Naval Research Logistics Quarterly, Vol 3, pp.201-2003, 1956. |
[5] | Ibrahim, M.A., “Algorithms for Sequencing and Scheduling,” Industrial Engineering Department, College of Engineering, King saud University, Riyadh, Saudi Arabia. |
[6] | Osman, M. R., Ismail, N., Zairian, M. R. M, Yusuf, R. M., Sapuan, S. M. “sheet metal Fabrication Scheduling Using Selective Performance Measure and priority Dispatching Rule,” International Journal of Engineering and Technology, Vol. 1 (1), pp. 74-83, 2004. |
[7] | Taylor, F. W., “Shop Management”, Harper And Bros, New York, 1911. |
[8] | Herrmann, Jeffrey. W “A history of production Scheduling” in Handbook of Production Scheduling, Springer, New York, 2006. |
[9] | Dudek, R. A., S. S. Panwalkar, and M. L. Smith, “The lessons for flow shop scheduling Research,” Operation Research, Vol 40(1), pp. 7-13, 1993. |
[10] | Conway, R. W., Maxwell, W. L., and Miller, L. W. “Theory of Scheduling,” Addison-Wesley Publishing Company, Massachusetts, 1967. |
[11] | Miloš Šeda “Mathematical Models of Flow Shop and Job Shop Scheduling Problems”, International Journal of Applied Mathematics and Computer Sciences Volume 4 Number 4. |
[12] | Kerem Bu¨lbu¨l, Philip Kaminsky, Candace Yano,” Flow Shop Scheduling with Earliness, Tardiness, and Intermediate Inventory Holding Costs”, Industrial Engineering and Operations Research, University of California, Berkeley, California 94720-1777. |
[13] | Mircea ANCĂU, “on solving flow shop scheduling problems” THE PUBLISHING HOUSE PROCEEDINGS OF THE ROMANIAN ACADEMY, Series A, OF THE ROMANIAN ACADEMY Volume 13, Number 1/2012, pp. 71–79. |
APA Style
Geleta Tadele Mohammed. (2016). New Algorithm for N-jobs on M-machine Flow Shop Scheduling Problems. Applied and Computational Mathematics, 5(1), 1-9. https://doi.org/10.11648/j.acm.20160501.11
ACS Style
Geleta Tadele Mohammed. New Algorithm for N-jobs on M-machine Flow Shop Scheduling Problems. Appl. Comput. Math. 2016, 5(1), 1-9. doi: 10.11648/j.acm.20160501.11
AMA Style
Geleta Tadele Mohammed. New Algorithm for N-jobs on M-machine Flow Shop Scheduling Problems. Appl Comput Math. 2016;5(1):1-9. doi: 10.11648/j.acm.20160501.11
@article{10.11648/j.acm.20160501.11, author = {Geleta Tadele Mohammed}, title = {New Algorithm for N-jobs on M-machine Flow Shop Scheduling Problems}, journal = {Applied and Computational Mathematics}, volume = {5}, number = {1}, pages = {1-9}, doi = {10.11648/j.acm.20160501.11}, url = {https://doi.org/10.11648/j.acm.20160501.11}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.acm.20160501.11}, abstract = {Because of flow shop scheduling is one of the most important problems in the area of production management, In this paper, what I have did is that, I have developed a new algorithm for n-jobs m-machine flow shop scheduling problem for special case of n-jobs m-machine flow shop scheduling problem. And also, there is a good self explanatory example to explain the algorithm very well.}, year = {2016} }
TY - JOUR T1 - New Algorithm for N-jobs on M-machine Flow Shop Scheduling Problems AU - Geleta Tadele Mohammed Y1 - 2016/01/15 PY - 2016 N1 - https://doi.org/10.11648/j.acm.20160501.11 DO - 10.11648/j.acm.20160501.11 T2 - Applied and Computational Mathematics JF - Applied and Computational Mathematics JO - Applied and Computational Mathematics SP - 1 EP - 9 PB - Science Publishing Group SN - 2328-5613 UR - https://doi.org/10.11648/j.acm.20160501.11 AB - Because of flow shop scheduling is one of the most important problems in the area of production management, In this paper, what I have did is that, I have developed a new algorithm for n-jobs m-machine flow shop scheduling problem for special case of n-jobs m-machine flow shop scheduling problem. And also, there is a good self explanatory example to explain the algorithm very well. VL - 5 IS - 1 ER -